Showing posts with label structural. Show all posts
Showing posts with label structural. Show all posts

Saturday, September 3, 2011

foundations dug...again!

Due to the open plan design there are a large number of structurally supporting walls in the downstairs.  These have now been dug and 16m3 of concrete poured all in a chilled days work.  This time there was no rain,clay or dogs jumping into the foundations ~ just an aggitated David as I stole his man power!(apparently)Internal walls let it begin,,,